Modernization of Sussman Apartments
Sussman was a design assist project where Chandler was contracted to install all new Curtainwall Windows Systems from EFCO, and Fiber Cement Panel systems from SVK.
Sussman was a design assist project where Chandler was contracted to install all new Curtainwall Windows Systems from EFCO, and Fiber Cement Panel systems from SVK.
Chandler has been selected to perform building envelope work on the new 350,000 sqft Veterans’ Home in Holyoke, MA. Chandlers scope of work includes triple glazed aluminum wood clad windows, unitized curtainwall, timber curtainwall, structural all glass curtainwall, insulated metal panels, ACM panels, wood siding, and interior glazing systems.
The Pomfret School’s “VISTA” – Venue for Innovation, Science, Technology, and Academics – is set to become a hub for cutting-edge courses, including aquaponics, robotics, forensics, astronomy, engineering, and environmental design. Chandler played a pivotal role in this project, providing and installing the entire building envelope.
The Challenge Design, manufacture and install a custom window system to tie into the building’s AVB system and design & engineer a hung, multi-story curtain wall system to resemble the randomness of tree branches. The Solution
The Challenge Develop a consistent, coherent communication plan to coordinate a job with many products within one larger project. The Solution The Project Manager worked closely with Fontaine Brothers and the architect to make sure the products were installed in a timely fashion. Meetings and well thought out, detailed shop drawings were key to coordinating … Read more
The Challenge Deliver an intricate designed scope within the construction manager’s aggressive schedule. The Solution This was a true team effort across the company, from the shop to the field, to ensure we could fabricate and install our scope during one of Chandler’s busiest times. Multiple crews were utilized to install the majority of the building … Read more
The Challenge Construct a modern library with state-of-the-art building products and glazing materials that meet LEED silver requirements. The Solution To procure multiple systems from USA, Germany and Switzerland that meet the demands of the project. Executing a team approach which allowed for understanding and applying of new construction techniques in both shop fabrication and … Read more
The Challenge The architectural design of the Plymouth Courthouse required Chandler’s expertise in fabricating and installing very large, oversized windows to achieve the aesthetics they desired. The Solution
The Challenge Complete the highly technical scope of The Engineering & Molecular Science Building in a tight time frame. The Solution The Project Manager dedicated his full attention to the job. It was imperative to have a seamless communication plan between Chandler, the G.C. and other trades in order to complete a highly technical job … Read more
Brightwood-Lincoln Elementary School is a 150,500 square foot building which will consolidate two existing elementary schools, both which were built over 100 years ago. Each school will still have an individual identity, with separate entrances and academic areas for the students, but will have communal recreational areas. The new building features natural day lighting, a sustainable design, … Read more