The New Cape Cod Regional Technical High School

The Challenge Furnish and Install Impact Rated facade systems for the nearly all glass 21-Centrury Regional School on Cape Cod. The Solution Our experienced team worked in conjunction with the General Contractor regarding fabrication and the installation sequence that fit within the schedule and flow of the construction project. Unique outward sloping and inward sloping … Read more

Basketball Hall of Fame

The Challenge The building’s composite panel system needed to be engineered and installed to meet the project’s unique architectural design intent. The Solution

Dearborn STEM Academy

The Challenge Design and Engineer hung curtain wall system with integral custom horizontal and vertical sun screens in the heart of Boston on a very challenging footprint. The Solution photo credit: Paul Warchol photography

MGM Music Hall at Fenway Park

The MGM Music Hall at Fenway Park is a new, state-of-the-art performing arts center being built on the triangle-shaped plot of land next to Fenway Park, know as ‘the Triangle Lot.’ The project will occupy roughtly 91,500 square feet and have a capacity of about 5,000 guests, making one of the most spacious entertainment venues in … Read more

East Providence High School

East Providence High School is a new, 304,000 square foot, four-story building with a capacity for 1,600 students in grades 9-12. The building will included expanded areas for the school’s Career and Technical Education (CTE) programs, including a food lab for Culinary Arts, a broadcast studio and control room for Radio and Television Broadcasting, a … Read more

Rhode Island School of Design

The Challenge Construct a Fiber Cement Panel Facade that is both sloped & staggered; Access & Sequence Work; (Compressed) 5 month schedule to complete entire fenestration & veneer package The Solution 1) Engineer a (hybrid) panel attachement system that met both of the design criteria 2) Utilized Platform Mast Climbers to proivde an adequate work … Read more

DeBerry-Homer Elementary School

DeBerry-Homer Elementary School is a new, three-story, 155,000 square foot building  with a capacity of 800 elementary students and 120 pre-K students. This building will replace two of the oldest school buildings in Springfield, MA. Each school, The DeBerry school and The Homer Street school, will maintain a separate identity for their classroom space, but will … Read more

Waltham High School

williams college digital art glass 999 695 c1

Waltham High School is a new, 414, 854 square foot educational facility for students in grade 9-12. The new building will have a capacity to serve 1,830 students and has been designed to accomodate future expansion. The new school has also been designed to provide students with access to integrated learning between the vocational programs … Read more

Williams College Science Center North Addition

williams college digital art glass 999 695 c1

The Challenge Complete construction of a new science building with tight project conditions, and many scopes of work we did not typically pursue. We were also required to utilize a variety of materials we had not used before. The Solution Our team focused on pre-planning, testing, and training to ensure we were prepared for the successful … Read more